San Miguel Corporation (SMC) is planning to build three 58-megawatt (MW) coal-fired power plants in the Autonomous Region in Muslim Mindanao (ARMM) to supply power..
Tag Archives: Coal fired power plants
Coal will remain to be the country’s main source of base – load energy come the next twenty years, an AC Energy Holdings Inc. official..
The construction of Redondo Peninsula Energy Inc.’s 600 megawatt coal-fired power plant in Subic, Zambales is set to begin in January 2017, an official said..
FDC Misamis Power Corp.’s 405-megawatt coal-fired power plant in Misamis Oriental was officially inaugurated on Thursday by President Rodrigo Duterte. The FDC Misamis Power Corp.’s..