NGCP OKs grid connection to PetroEnergy 33.8MWp solar project
- February 10, 2025
The Limbauan Solar Power Project (LSPP-2) has secured National Grid Corporation of the Philippines (NGCP) approval for grid connection, paving the way for its integration into the national transmission network. Backed by